Supplier compliance software
Your annual PUC supplier filing is a regulatory requirement. Is your certified supplier data defensible?
State utility commissions require annual reporting on diverse supplier spend. The filing is only as strong as the certified data behind it. Supplier.io keeps that data continuously maintained.
Built for: Electric, gas, and water utilities, telecom, and energy companies regulated in the 11 mandate states.
Stay ahead of compliance with real-time tracking of your suppliers and subcontractors
Suppliers in our database
Supplier insights
Trusted sources of supplier data
Annual PUC filings are reviewed by state commissioners. Data quality, certification accuracy, and documentation are all on the table. A filing built from manually assembled spreadsheets is a filing that can be questioned.
Get the PUC GuideHOW SUPPLIER.IO HANDLES YOUR SUBCONTRACTOR REPORTING
Get filing-ready subcontractor data with a lot less work
Automated collection from your primes
Tier 2 Reporting sends automated data requests to your primes every time a reporting period opens. Submissions come through a standardized portal that takes most primes about ten minutes.
Verified against the Supplier.io database
Verification is built into the platform: certifications for every supplier your primes report by name are automatically checked against the Supplier.io database of 20M+ suppliers from 450+ authoritative sources. Expired or unmatched certifications are flagged.
Filing-ready output from one record
Tier 2 Reporting produces state commission formatted output from the maintained record, in each state’s categories, ready for the annual filing and the questions that follow it.
Beyond the filing: risk and impact
Empower suppliers to update and certify their information for traceable, audit-ready data from the source.
Operating a Compliant Supplier Diversity Program
How to Keep Your Program Effective and Defensible in 2026
Join us on-demand for a practical conversation on what it means to run a compliant supplier diversity program today across language, processes, and reporting.
Frequently asked questions
Details about PUC annual supplier reporting
Which utilities are required to file?
Utilities operating in mandate states such as California (GO 156), Illinois (220 ILCS 5/5-117), New York, and Texas, each with its own annual supplier diversity filing requirement to the state commission.
What does a state commission actually review in the filing?
Commissioners look at data quality, certification accuracy, and category classifications, not just headline percentages. A number that cannot be traced back to a verified source is a number that can be challenged.
What makes supplier certification data defensible in a commission filing?
Supplier.io verifies every named subcontractor certification against the issuing body continuously, rather than reconstructing the record once a year for the filing.
Why does year-round data collection matter for an annual filing?
The filing reflects what was maintained, not what was assembled in the final month. Certifications that lapse mid-year are easy to miss without continuous tracking.
How long does implementation take?
Standard onboarding is 60 days. Count back from your state’s deadline: California files March 1, Illinois files April 15.
Speak with an expert on supplier intelligence
Take your procurement program to the next level with industry-leading data, software, and best practices.